Suchergebnisse

Nachstehend finden Sie die Ergebnisse der Suchmaschine zu ihrer Anfrage.

Zeigen 1551-1560 von 2745 Ergebnisse

Submission of Quarterly Progress Report Pursuant to Consent Order Paragraph 28 - July 31, 2024

Chemours is pleased to submit the enclosed quarterly progress report, as required under paragraph 28 of the Consent Order entered by the Superior Court for Bladen County on February 25, 2019.

Interim SEEP Remediation Operation and Maintenance Report #14

This Operations and Maintenance Report #14 (O&M Report #14) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from March 1 through April 30, 2023.

Submission of PFAS Non-Targeted Analysis and Methods Interim Report Chemours Fayetteville Works, Fayetteville, NC - December 23, 2024

Chemours is submitting the enclosed PFAS Non-Targeted Analysis and Methods Interim Report #10.

CFR Long-Term Remedy Performance Monitoring Report #7 (Q3 2024) July - September 2024

This CFR Long-Term Remedy Performance Monitoring Report #7 (“Report”) has been prepared for the Q3 2024 period of July 1 through September 30, 2024, and documents the operation of the interim seep Flow-Through Cells (FTCs), the ex-situ seeps and weeps capture systems (“Ex-Situ Capture Systems”), the groundwater extraction and conveyance system (GWEC), and the groundwater treatment plant (GWTP).

Submission of Quarterly Progress Report Pursuant to Consent Order Paragraph 28 - October 28, 2024

Chemours is pleased to submit the enclosed quarterly progress report, as required under paragraph 28 of the Consent Order entered by the Superior Court for Bladen County on February 25, 2019.

Consent Order Addendum - Submission Pursuant to Paragraph 2.c.v - December 20, 2024

Please find enclosed the CFR Long-Term Remedy Performance Monitoring Report #7 (Q3 2024).

PFAS NON-TARGETED ANALYSIS AND METHODS INTERIM REPORT #10

Process and Non-Process Wastewater and Stormwater

CHARACTERIZATION OF PFAS IN PROCESS AND NON-PROCESS WASTEWATER AND STORMWATER Quarterly Report #2

This report was prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours) to provide a quarterly update on the identification and concentrations of per- and polyfluoroalkyl substances (“PFAS”) in process wastewater, non-process wastewater, and stormwater at the Chemours Fayetteville Works, North Carolina site

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT - APPENDIX A

This appendix presents results from the Q2 2024 sampling events described in Section 2 of the main report.

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT - APPENDIX A

This appendix presents results from the Q3 2024 sampling events described in Section 2 of the main report.